MTA Metro-North Railroad President Cathy Rinaldi announced that as of March 14 Metro-North's full Harlem and Hudson lines are operating in Positive Train Control (PTC), bringing Metro-North's total of PTC-equipped route miles to 189, which represents 68% of its mileage.
The coverage includes all trains along the Hudson Line’s 74 miles from Grand Central Terminal to Poughkeepsie, and the Harlem Line’s 82 miles from Grand Central Terminal to Wassaic, including Amtrak and CSX freight.
The coverage includes all trains along the Hudson Line’s 74 miles from Grand Central Terminal to Poughkeepsie, and the Harlem Line’s 82 miles from Grand Central Terminal to Wassaic, including Amtrak and CSX freight.
Metro-North’s Harlem, Hudson Lines Fully PTC-Equipped - Railway Age
MTA Metro-North Railroad President Cathy Rinaldi announced that as of March 14 Metro-North's full Harlem and Hudson lines are operating in Positive Train Control (PTC), bringing Metro-North's total of PTC-equipped route miles to 189, which represents 68% of its mileage.
www.railwayage.com